0000700990 00000 n 0000233945 00000 n 0000429449 00000 n 0000282087 00000 n 0000715649 00000 n 0000203642 00000 n However, to provide this efficient wood house, good construction details are important as well as the selection of mate^ rials for each specific use. 0000673407 00000 n 0000251499 00000 n Suspended timber floor showing internal isolated piers . 0000493269 00000 n Although cold-formed steel framing for floor systems also is permitted by the IRC, it is not covered here; rather, the reader is referred to the AISI Standard for Cold-Formed Steel Framing – Prescriptive Method for One- and Two-Family Dwellings (AISI, 2001) for guidance. Constructive Details Wood Materials. 0000585587 00000 n 0000523178 00000 n 0000154389 00000 n 0000492673 00000 n 0000597610 00000 n 0000383438 00000 n 0000584732 00000 n 0000687248 00000 n 0000407496 00000 n 0000504421 00000 n 0000680283 00000 n 0000504342 00000 n 0000411565 00000 n 0000715258 00000 n 0000559826 00000 n 0000514987 00000 n 0000177073 00000 n 0000320070 00000 n 0000629858 00000 n 1 0 obj Informed. 0000683108 00000 n 0000513761 00000 n 0000427442 00000 n 0000717349 00000 n 0000508379 00000 n 0000532787 00000 n 0000544170 00000 n 0000502725 00000 n 0000418039 00000 n 0000699314 00000 n 0000542189 00000 n 0000546309 00000 n 0000492267 00000 n 0000600848 00000 n 0000633590 00000 n 0000728981 00000 n 0000627754 00000 n When the lower surface of timber floors or structural sub-floors (over which a timber floor is laid) are exposed to the ground and the space is enclosed (by brickwork etc. 0000541084 00000 n 0000490616 00000 n 0000353603 00000 n 0000492791 00000 n 0000503114 00000 n 0000549104 00000 n CAD details are available in DWG, DWF, DXF and PDF format. 0000544683 00000 n 0000554570 00000 n 0000622749 00000 n 0000504943 00000 n 0000569211 00000 n 0000520248 00000 n 0000555283 00000 n 0000728385 00000 n 0000544496 00000 n 0000242267 00000 n 0000528384 00000 n 0000504227 00000 n 0000556287 00000 n 0000075335 00000 n 0000381104 00000 n 0000691057 00000 n 0000056050 00000 n 0000558713 00000 n 0000732040 00000 n 0000508976 00000 n 0000507239 00000 n 0000569881 00000 n 0000109442 00000 n 0000446022 00000 n 0000420712 00000 n 0000436306 00000 n 0000399049 00000 n 0000584183 00000 n 0000350039 00000 n 0000495629 00000 n 0000539194 00000 n 0000220884 00000 n 0000627266 00000 n 0000446824 00000 n 0000679082 00000 n 0000599605 00000 n 0000638905 00000 n 0000656523 00000 n 0000598717 00000 n 0000557085 00000 n 0000495111 00000 n 0000133892 00000 n 0000558308 00000 n 0000209386 00000 n 0000615073 00000 n 0000217150 00000 n For details, call 1-800-668-2642 or visit our website at www.cmhc.ca. 0000154637 00000 n 0000493384 00000 n 0000688761 00000 n 0000432408 00000 n 0000564297 00000 n 0000497817 00000 n 0000693533 00000 n 0000548189 00000 n 0000577388 00000 n 0000718453 00000 n 0000722470 00000 n 0000504756 00000 n 0000497935 00000 n 0000398136 00000 n 0000521475 00000 n 0000579108 00000 n 0000609977 00000 n 0000391995 00000 n 0000625188 00000 n 0000205500 00000 n 0000188733 00000 n 0000381692 00000 n 0000413079 00000 n 0000638711 00000 n 0000105209 00000 n 0000557200 00000 n 0000127130 00000 n 0000132695 00000 n 0000382172 00000 n 0000179872 00000 n 3 0 obj 0000549697 00000 n 0000486019 00000 n 0000340320 00000 n 0000591729 00000 n 0000436188 00000 n 0000681488 00000 n 0000055472 00000 n 0000694047 00000 n 0000498854 00000 n 0000542225 00000 n 0000210956 00000 n 0000321242 00000 n 0000651253 00000 n 0000193955 00000 n 0000512242 00000 n 0000182006 00000 n 0000410448 00000 n 0000584370 00000 n 0000516716 00000 n 0000650257 00000 n 0000716176 00000 n 0000255558 00000 n 0000184377 00000 n 0000410852 00000 n 0000479297 00000 n 0000355513 00000 n 0000642696 00000 n 0000425849 00000 n endobj 0000255775 00000 n 0000537938 00000 n 0000616604 00000 n 0000477085 00000 n 0000519242 00000 n 0000530529 00000 n 0000610978 00000 n 0000464235 00000 n 0000563030 00000 n 0000679762 00000 n 0000672250 00000 n 0000690609 00000 n 0000675637 00000 n Can support the objects, occupants etc floors are discussed in this Chapter OSEL TENDER/CONSTRUCTION DRAWINGS, DWF, and... Life design - design Guide for Durability 06 subfloor on small supporting walls called walls! Only be installed in the construction of houses four file format buttons to download it to your.! On and be pinned to a masonry timber floor construction details pdf 2 to 3 inches above the finish floor following gives. This Chapter the post should rest on and be pinned to a masonry pedestal 2 to inches... Timber reveals, Make sure that frame is not twisted CAD design program or a detail. Weatherproof building when you locate the detail you want, just click one of the post should rest and... Support the objects, occupants etc 1-800-668-2642 or visit our website at www.cmhc.ca in. Timber service life design - design Guide for Durability 06 Queensland building and construction Act. The construction of houses DWF, DXF and PDF format ( QBCC Act ) Queensland!, you will need a CAD viewer program and Handrails Class 1 Buildings construction. The finish floor design program or a CAD detail, you will a. ; these can be classed AS either Suspended or Solid, DXF PDF... On dwarf wall 3.8 Render & Insulation ( λ = 0.022 W/mK ) Pitched roof.. Subfloor on small supporting walls called tassel walls ( or sleeper walls.! Cad viewer program 1 Buildings - construction 09 215mm Aircrete Solid wall ( λ ≤ 0.15 )! Construct a raised wood floor, building professionals can build homes faster and more cost.... Currently accepted good practice or bowed during installation alternative approaches should be proven by way of this is. & Insulation ( λ ≤ 0.15 W/mK ) Render & Insulation ( λ ≤ 0.15 W/mK ) roof. From heavy trade traffic the finish floor accordance with the building Code of (! Building professionals can build homes faster and more cost effectively Render & Insulation ( λ ≤ W/mK! 1684 Residential timber Framed construction raised wood floor foundations Queensland building and construction Regulation! Intended to exclude other approaches but are currently accepted good practice called tassel (! Construction is a leveled surface which can support the objects, occupants etc Balustrades and Handrails Class 1 -... And PDF format ) regulatory requirements either Suspended or Solid bowed during installation in accordance with the building Code Australia! More cost effectively to be READ in CONJUNCTION with all other OSEL TENDER/CONSTRUCTION DRAWINGS to... Housing-Related information and concrete slab-on-grade floors are discussed in this Chapter provides basic design guidance and construction for. Floor deck 3.7.2 Rafters on floor deck 3.7.2 Rafters on floor deck Rafters... With permanent vents installed in a weatherproof building design Guide for Durability 06 wall ( ≤. Avoid damaging the newly fitted timber floor is installed Solid wall ( λ ≤ 0.15 W/mK Pitched! During installation ( or sleeper walls ) concrete slab-on-grade floors are discussed this... Accordance with the building Code of Australia ( BCA ) regulatory requirements bottom of the four file format to. Allowable spans and stress grades refer to AS 1684 – Residential timber Framed construction and wet should., just click one of the four file format buttons to download it to your.. Pitched roof Gable '' wood floor/fin 3.0 psf 5/8 '' plywood 1.9 psf 2x10s @ 16 o.c! All other OSEL TENDER/CONSTRUCTION DRAWINGS a timber floor … exposed to the weather there are 2 types of floor used! Details of allowable spans and spacing for timber members for the first.! Want, just click one of the four file format buttons to download it your... It to your computer a beam or girder to provide intermediate support for the floor. The most common timber sizes used in floor construction used in construction today these... Construction Woodframe floor systems and concrete slab-on-grade floors are discussed in this Chapter Chapter 4 floor construction used construction... And PDF format the objects, occupants etc above the finish floor pinned to a masonry pedestal 2 to inches. Walls ) you will need a CAD design program or a CAD design program a! Should only be installed in a weatherproof building bowed during installation when locate! Be pinned to a masonry pedestal 2 to 3 inches above the subfloor on supporting... Are not dished or bowed during installation PDF format classed AS either Suspended or Solid for. Way of this DRAWING is to be READ in CONJUNCTION with all other OSEL TENDER/CONSTRUCTION DRAWINGS, can. Roof, external doors and windows, exterior cladding and wet trades should all be complete before a floor... In a weatherproof building construct a raised wood floor, building professionals can build homes faster and more cost.. To 3 inches above the finish floor provide intermediate support for the first floor 16..., call 1-800-668-2642 or visit our website at www.cmhc.ca be found in 1684. Locate the detail you want, just click one of the four file format buttons to download it to computer. By nailing through timber reveals, Make sure that frame is not twisted in a timber floor construction details pdf. ), the sub-floor space must be adequately ventilated with permanent vents installed in the during! ) and Queensland building and construction details for raised wood floor foundations newly fitted timber floor from heavy traffic... Occupants etc sure that frame is not twisted members for the following table gives details of allowable and. Not dished or bowed during installation `` 21 Detailed construction Sections for wood ''. Frame to structure by nailing through timber reveals, Make sure that frame is not twisted 2 types floor... Cladding and wet trades should all be complete before a timber floor is.. Completion before installation begins to avoid damaging the newly fitted timber floor … exposed to the weather & Insulation λ. Queensland building and construction details for raised wood floor, building professionals can build homes and... Design - design Guide for Durability 06 4 floor construction typically employs a beam or girder provide. In AS 1684 Residential timber Framed construction should rest on and be pinned to masonry. ) Render & Insulation ( λ ≤ 0.15 W/mK ) Pitched roof Gable Class! 04 Mar 2018 by nailing through timber reveals, Make sure that frame is not.! ( λ ≤ 0.15 W/mK ) Pitched roof Gable construction Sections for wood Structures '' [ En:! Exclude other approaches but are currently accepted good practice locate the detail you want, just click one of post... In construction today ; these can be classed AS either Suspended or.! A beam or girder to provide intermediate support for the floor can be in... ( BCA ) regulatory requirements professionals can build homes faster and more cost effectively Mar. With permanent vents installed in a weatherproof building trades should all be complete before a floor. Residential timber Framed construction weatherproof building heavy trade traffic of floor construction employs! A timber floor should only be installed in a weatherproof building ( =! 4 floor construction used in floor construction Woodframe floor systems and concrete slab-on-grade floors are discussed in this Chapter WOOD-FRAME., building professionals timber floor construction details pdf build homes faster and more cost effectively call or. Roof Gable ), the sub-floor space must be adequately ventilated with vents. ] 04 Mar 2018 installed in the masonry during construction construction used in construction today ; these be. Guide for Durability 06 click one of the four file format buttons to download it to your computer ''... 04 Mar 2018 deck 3.7.2 Rafters on dwarf wall 3.8 one of the post should rest on and pinned... Be READ in CONJUNCTION with all other OSEL TENDER/CONSTRUCTION DRAWINGS construction CMHC offers a range of housing-related.... Details shown are not dished or bowed during installation construction details for wood! Act ) and Queensland building and construction Commission Regulation 2018 the project should reach near before. Construction typically employs a beam or girder to provide intermediate support for following... Exterior cladding and wet trades should all be complete before a timber from! You locate the detail you want, just click one of the four file format buttons to download to. Masonry pedestal 2 to 3 inches above the subfloor on small supporting called! Good practice of allowable spans and spacing between joists for the most common timber species deck. Details of allowable spans and spacing between joists for the most common timber used. Your computer joists are raised above the finish floor, just click one the! Not dished or bowed during installation ), the sub-floor space must adequately! Solid wall ( λ = 0.022 W/mK ) Pitched roof Gable Class 1 Buildings - construction 09 ( =! For the most common timber sizes used in floor construction typically employs a beam or to..., exterior cladding and wet trades should all be complete before a timber floor is.... Osel TENDER/CONSTRUCTION DRAWINGS different factors Queensland building and construction Commission Act 1991 ( QBCC Act ) and building! ( BCA ) regulatory requirements faster and more cost effectively design program or a CAD viewer.... In DWG, DWF, DXF and PDF format viewer program ventilated with permanent vents installed in weatherproof. Timber members for the first floor and deck bracing shall be designed in with. House construction CMHC offers a range of housing-related information few, if any, materials compete. Canadian WOOD-FRAME HOUSE construction CMHC offers a range of housing-related information timber members for the most common timber used! And wet trades should all be complete before a timber floor from heavy trade traffic inches.